Before installing or using your solar air conditioner, please print and read this manual carefully and keep it for future reference. Please rea
ELECTRICAL WORK C: Putting Nut On Remove flare nuts attached to indoor and outdoor unit, then put them on pipe/tube having completed burr removal.
ELECTRICAL WORK Minimum nominal cross-sectional area of conductors: Rated current Nominal cross-sectional of appliance area (A) (mm) NOTE:
ELECTRICAL WORK 7. Reinstall the electrical box cover, keep the white band just under the groove as shown in Fig. 26a and curve the cable into the g
ELECTRICAL WORK Installation of the solar photovoltaic system This guide contains information regarding the installation and safe handling of solar
ELECTRICAL WORK When disconnecting wires from a photovoltaic module that is exposed to sunlight, an electric arc may result. Such arcs may cause bur
Do NOT Connect in Series. It must be a Parallel connection.
ELECTRICAL WORK Only perform installation in dry conditions. Fig.38 Abide with the safety regulations for all other components used in the system, i
ELECTRICAL WORK Fig.40 2. Selecting the proper support frame Always observe the instructions and safety precautions included with the support frame
4. Roof mount ELECTRICAL WORK When installing a module on a roof or building, ensure that it is securely fastened and cannot fall as a result of wi
ELECTRICAL WORK 6. General installation Module mounting must use the pre-drilled mounting holes in the frame. The most common mounting is achieved
CONTENTS SAFETY PRECAUTIONS Warning 2 Caution 2 Selecting installation location 3 Accessories 4 Indo
Extension cables will be needed in the 3 panel configuration connecting The J-Box cables to the combiner box. See figure 52a.
ELECTRICAL WORK Connection method B: Using 2 panels see Fig.52b. Outdoor unit wire connection Fig.52b If you want to connect the photovoltaic mo
Wiring the MNPV3 21
GROUNDING PRINCIPALS • Equipment grounding provides protection from shock caused by a ground fault and is required for all PV systems by the NEC.
2 Panel Grounding 23 Liquid Tight conduit may be used between the Standard AC Disconnect and the 30 AMP internal breaker in the Outdoor Unit. Max 6 f
3 Panel Grounding 24 Liquid Tight conduit may be used between the Standard AC Disconnect and the 30 AMP internal breaker in the Outdoor Unit. Max 6 f
ELECTRICAL WORK Do not attach the cable on the sharp edge of the frames. Fig.54 Attention to the minimum bending radius of the wire. Fig.55 Do no
ELECTRICAL WORK If you want to use the connector purchased by yourself, the following requirements must be complied: Use only connector special des
EVACUATION CAUTION After complying to the above conditions, prepare the wiring as follows: 1) Never fail to have an individual power circuit specifi
EVACUATION When moving the unit to new location, perform evacuation using vacuum pump. Make sure the refrigerant added into the air conditioner is
SAFETY PRECAUTIONS Read the follow SAFETY PRECAUTIONS carefully before installation. Electrical work must be installed by a licensed electrician. Be
INSTALLATION INSTRUCTIONS Selecting installation location Select an installation location which is rigid and strong enough to support or hold the un
INSTALLATION INSTRUCTIONS Indoor unit installation 1. Fit the installation plate horizontally on structural parts of the wall with spaces around
INSTALLATION INSTRUCTIONS Connective Tube and Drainage Installation 1. Run the drain hose sloping downward. Do not install the drain hose as i
INSTALLATION INSTRUCTIONS Piping and wrapping Bundle the tubing, connecting cable, and drain hose with tape securely, evenly as shown in Fig.11 B
REFRIGERANT TUBE CONNECTION Placement of outdoor unit Anchor the outdoor unit with bolts and nuts on a concrete or rigid mount. . Drain Joint Ins